wp12c6d6eb.png

We help

 your assets and projects stay

“on track”

wpef4fb419.png
wp963b07e4.png
wp578399d8.png

 

© Copyright 2009. TRCCG, LLC All Rights Reserved.

 

 

TRC Consulting Group Retail Projects

TRCCG Restaurant/Retail Projects

Dobson Park Plaza

Chandler, Arizona

Dobson Park Plaza TRCCG completed a Phase I ESA for a retail shopping center located at 2015-2025 North Dobson Road in Chandler, Maricopa County, Arizona.

 

The site consists of a single-story retail supermarket with ten additional retail tenants located in the attached strip mall. Tenants include a beauty supply store, furniture store, groomers, dentist, salon, and acupuncture. The building was constructed in 1989 on a 5.66-acre parcel of land.

 

The environmental assessment work identified no recognized environmental conditions connected to the site.

Ling & Louie's Asian Bar and Grill

Scottsdale, Arizona

Chandler, Arizona

TRCCG was brought in by Desert Islands Restaurants to provide design assistance as well as bid assistance and contractor selection for construction of its new Asian concept, Ling & Louie's.

 

TRCCG's services included value engineering, construction budget development, and general construction management throughout the project.

Retail Shopping Center

Glendale, Arizona

Retail Shopping Center TRCCG completed a Phase I ESA for a retail shopping center located at 5905-5985 West Bell Road in Glendale, Maricopa County, Arizona.

 

The site consists of three single-story retail buildings with a rentable area of 65,130 square feet located on a 6.96-acre parcel of land. Tenants include a salon, dentist, restaurant, furniture store, sofa shop, and a medical/dialysis facility. The core of the shopping center (the two western buildings) was constructed in 1981 and the easternmost building of the site's shopping center was constructed in 1986.

 

The environmental assessment work identified no recognized environmental conditions connected to the site; however, staining was noted on the concrete slab beneath a transformer, which appeared to be leaking. Recommendations were made to the client to contact the local electrical utility company regarding the leakage.

Sau'tee Restaurant

Chandler, Arizona

Sau'tee Restaurant

TRCCG was brought in by Southwest Restaurant Ventures to provide design assistance as well as bid assistance and contractor selection for construction of a new Sau'tee restaurant in Chandler, Arizona.

 

TRCCG's services included value engineering, construction budget development, and general construction management throughout the project.

TusCa Ristorante

Monterey, California

TusCa Ristorante TRCCG was brought in by Hyatt Development Corporation (HDC) to provide design assistance as well as bid assistance and contractor selection for construction of a new Italian restaurant and wine room at the Hyatt Regency in Monterey, California.

 

TRCCG's services included value engineering, construction budget development, and general construction management throughout the project.

Ruth’s Chris Steak House

Hawaii

 

Hawe Restaurant

Chandler, Arizona

TRCCG was brought in by Desert Islands Restaurants to perform Building Condition Assessments on 6 restaurants on the Hawaiian islands.

 

TRCCG's services included a review of the overall building condition at the restaurants as well as a review of the condition of the kitchen equipment and restaurant fixtures.

wp810b0fd5_0f.jpg

Asian Restaurant

Scottsdale, Arizonai

 

Hawe Restaurant

Chandler, Arizona

TRCCG was brought in to perform an FF&E asset inventory at an Asian-themed restaurant in Scottsdale, Arizona.

 

TRCCG's services included itemizing all kitchen, sushi bar, and front of house equipment and furniture on a  spreadsheet, documenting equipment on photo pages, and  providing salvage (auction) cost of equipment.

wp94c7218a_0f.jpg